Skip to Main Content
Jedox Ideas

Let us know how we can make Jedox even better!

ADD A NEW IDEA

Clear

Ideas

Showing 193

Multiple Table Joins in one transform

As a Model Builder, I want to join multiple sources in one single step so that I can accomplish my tasks with as little ETL footprint as possible and have a more intuitive ETL Flow Graph. Often there are multiple sources where values have to be re...
almost 4 years ago in Jedox Platform / Integrator 0 Future Consideration

Constant Table | Allow user to copy in an array on data

It would be quite hand to allow us to copy in an array of values (from excel for example). Having to type out, or copy each cell, on a cell-by-cell basis is tedious. e.g., In Power BI Desktop when using the "Enter Data", the user can just copy acr...
5 months ago in Jedox Platform / Integrator 0 Future Consideration

Roll-back of write actions when execution of Integrator job fails

When executing an Integrator job that writes data to a database with limited user permissions in that database, it could happen that the job does not complete successfully because some write actions fail (due to missing permissions of the user). I...
about 2 years ago in Jedox Platform / Integrator 0 Future Consideration

Add 4,4,5 as options for Time dimensions

We need to enhance the Time editor to allow a 4,4,5 weeks/period time dimension. There is a common business cycle that leverages 4,4,5 weeks over the 52 weeks of the year. So, period 1 is 4-week, period 2 is 4 weeks, and period 3 is 5 weeks. This ...
about 2 years ago in Jedox Platform / Other 0 Future Consideration

Option for automatical restart of ETL jobs after the server went down or restarts

Scenario:There is a long running ETL job and the Jedox server or part of services went down or "crashes". After the (re-)start of the components/services the ETL jobs are marked as failed or aborted. Here there is need for a feature or a new optio...
about 1 year ago in Jedox Platform / Integrator 0 Future Consideration

Google Sheets Jedox Add-in

More and more clients seem to be leveraging Google sheets instead of Excel. Anaplan is pursuing this strongly, and we need to consider making this an option as well.
almost 4 years ago in Jedox Platform / Microsoft Office integrations (Excel, PowerPoint, & Word) / Other 1 Future Consideration

Connection to Xero

Introduce a native Jedox connector for Xero, enabling connection and extraction of key financial data like Trial Balance, Aged Payables, Journals, and other standard reports. Encryption and OAuth 2.0 authentication to comply with Xero's security s...
11 months ago in Jedox Platform / Integrator 0 Future Consideration

Integrator: Enable writeback via load for JDBC connections.

Integrator: Enable writeback via load for JDBC connections Users expect that writeback is also supported by JDBC connections.
over 4 years ago in Jedox Platform / Integrator 1 Future Consideration

alternating row color for DynaRange

Currently one has to create a conditional formatting to implement alternating row colors. As soon as rows are dynamically hidden or extended (e.g. drill-down in DynaRange), the alternating row colors are broken. Just like the frame of the DynaRang...
over 6 years ago in Jedox Platform / Other 0 Future Consideration

Start Scheduled Tasks from Integrator (Batch PDF, etc)

I want to start PDF Batches or Excel Batches after a successfull Integrator job (conditional job). Only if the necessary data was created during an ETL it would be quite convenient to start this PDF Batches from the integrator job as a last step –...
over 3 years ago in Jedox Platform / Integrator 0 Future Consideration