Sometimes (while in development or production) an ETL job fails at a certain point. Then often all steps before were successful and after solving the problem I would like to continue the ETL from the failed element onwards. Instead I have to resta...
Add navigation capabilities (previous/next/first/last) in the FieldTransform functions
if you want to edit the next or the previous function in ETL client, you have to close the current one, and click on edit for the following. This would be helpful to jump to the next or previous one without closing the window
It's necessary to have an option of Partial Reload in the Integrator Qlik Load. Qlik Sense supports it. And it saves a lot of time during data sinchronization between Jedox and Qlik.
The Database name are usually used as reference with apps. In case that a Database is renamed all these references stop working. In our solution design we use the ID from Metadata to ensure that we always have the correct database as reference (it...
Sometimes this could be useful to be able to pin more than 1 view in Integrator (for instance up to 3) My current use case is that I have e.g. a FieldTransform (let's call it "Target"), I want a function that is in another one component (let's nam...
Can we have both Job AND Load execution in a Switch job?
can we have both Job AND Load execution in a Switch job? Currently only Job is possible. This is a bit cumbersome because one has to create an extra Job on top of each Load.
Showing number of rows if selected extract from cube
This should show information on how many lines are maximally possible to extract. Let's say that cube has 20540 filled cells for dimension filters. This number could be shown next to loaded cells.
Assign used variables from ETL execution as default variable values
The idea is that the user is able to copy execution variables from the "Used variables" in the executions list to the Variable in Integrator. That makes it easer to drill into data previews with the proper variable assignment (without manually typ...