Skip to Main Content
Jedox Ideas

Let us know how we can make Jedox even better!

ADD A NEW IDEA

Integrator

Showing 164

Add BigQuery jdbc Integrator Connector

Add a JDBC based connection for Google BigQuery that uses the GoogleToken mechanism for authorisation
over 3 years ago in Jedox Platform / Integrator 0 Future consideration

Start ETL Job from any position

Sometimes (while in development or production) an ETL job fails at a certain point. Then often all steps before were successful and after solving the problem I would like to continue the ETL from the failed element onwards. Instead I have to resta...
over 5 years ago in Jedox Platform / Integrator 0 Future consideration

Netsuite connector

A dedicated connector for Netsuite, rather than using JDBC
over 5 years ago in Jedox Platform / Integrator 0 Future consideration

Add navigation capabilities (previous/next/first/last) in the FieldTransform functions

if you want to edit the next or the previous function in ETL client, you have to close the current one, and click on edit for the following. This would be helpful to jump to the next or previous one without closing the window
over 5 years ago in Jedox Platform / Integrator 0 Future consideration

Qlik Connector Partial Reload

It's necessary to have an option of Partial Reload in the Integrator Qlik Load. Qlik Sense supports it. And it saves a lot of time during data sinchronization between Jedox and Qlik.
over 3 years ago in Jedox Platform / Integrator 0 Future consideration

Pin multiple Integrator views

Sometimes this could be useful to be able to pin more than 1 view in Integrator (for instance up to 3) My current use case is that I have e.g. a FieldTransform (let's call it "Target"), I want a function that is in another one component (let's nam...
almost 2 years ago in Jedox Platform / Integrator 0 Future consideration

extend Metadata with "Dimension ElementID"

The Database name are usually used as reference with apps. In case that a Database is renamed all these references stop working. In our solution design we use the ID from Metadata to ensure that we always have the correct database as reference (it...
almost 4 years ago in Jedox Platform / Integrator 0 Future consideration

Can we have both Job AND Load execution in a Switch job?

can we have both Job AND Load execution in a Switch job? Currently only Job is possible. This is a bit cumbersome because one has to create an extra Job on top of each Load.
about 2 years ago in Jedox Platform / Integrator 0 Future consideration

Showing number of rows if selected extract from cube

This should show information on how many lines are maximally possible to extract. Let's say that cube has 20540 filled cells for dimension filters. This number could be shown next to loaded cells.
about 2 years ago in Jedox Platform / Integrator 0 Not Planned

Assign used variables from ETL execution as default variable values

The idea is that the user is able to copy execution variables from the "Used variables" in the executions list to the Variable in Integrator. That makes it easer to drill into data previews with the proper variable assignment (without manually typ...
about 2 years ago in Jedox Platform / Integrator 0 Future consideration