Skip to Main Content
Jedox Ideas

Let us know how we can make Jedox even better!

ADD A NEW IDEA

Integrator

Showing 175

SQL-Generator for ETL Relational Extract

SQL Query Designer with UI that generates SQL from clicks, e.g. Query Builder as in MS Access + Editor with Syntax highlighting for SQL. #6396
over 5 years ago in Jedox Platform / Integrator 1 Not Planned

Tomcat multicore support

As I have been informed by Jedox Dev team, the ETL-Server (Tomcat Service) is running one job per CPU core. This behaviour is mainly slowing down our ETL projects since a huge amount of data has to be proceeded. The number of cores that should be ...
over 5 years ago in Jedox Platform / Integrator 2 Not Planned

Tags for ETL-components

Choose several ETL components of one project which belong somehow logically together and group them under a given name. Should be displayed in ETL Manager under a new item -Tags --- SalesRelated ------Extract --------- E_XY_1 --------- E_XY_2 ----...
over 5 years ago in Jedox Platform / Integrator 2 Planned

The Project box is not wide enough to show the full project names

The dropdown list in the 'Project' box is not wide enough to display the full project names. This limitation can pose challenges for users in identifying the correct project to choose, especially for a long project name; for example, a project...
about 1 year ago in Jedox Platform / Integrator 0 Planned

Include "Column Exclude pattern" into Table View Transformation

Many times, a Table View Transformation is the final step of loading data into different sources. It would therefore be very handy to also have the Column Exclude/Include patterns in this transformation. This way, you don't have to define the whol...
3 months ago in Jedox Platform / Integrator 0 Future Consideration

Option to ignore format in Excel Extract

When there's an error in one of the columns due to a wrong format or null values in some cells, the Excel Extract will not load and instead return an error. An option to either ignore the format of columns or ignore columns entirely, if they're no...
3 months ago in Jedox Platform / Integrator 2 Future Consideration

Import Integrator Projects from SFTP (with ELT Project)

As a consultant, I would like to upload Integrator Projects from an SFTP Server. Basically, we would like to have the basic functionality of the "Import" option within the Integrator as a function that we can use within an ETL Job. This way we cou...
9 months ago in Jedox Platform / Integrator 2 Future Consideration

Undo in Integrator

There is no way of undoing a change in Integrator rather than reloading the whole ETL Project. Once a change has been made one is forced to save! Would be helpful if you can leave a changed integrator component without saving it.
over 5 years ago in Jedox Platform / Integrator 1 Planned

Audit Integrator Connection to extract Audit information

Hello, the idea is to have a connection type Audit that enables us to extract all audit information for a specific cube. Also it should be possible to select if the extract is as ID or as element name from the dimensions. This is necessary for sev...
about 1 year ago in Jedox Platform / Integrator 1 Future Consideration

Start Scheduled Tasks from Integrator (Batch PDF, etc)

I want to start PDF Batches or Excel Batches after a successfull Integrator job (conditional job). Only if the necessary data was created during an ETL it would be quite convenient to start this PDF Batches from the integrator job as a last step –...
over 2 years ago in Jedox Platform / Integrator 0 Future Consideration