Skip to Main Content
Jedox Ideas

Let us know how we can make Jedox even better!

ADD A NEW IDEA

Integrator

Showing 147 of 1093

Pin multiple Integrator views

Sometimes this could be useful to be able to pin more than 1 view in Integrator (for instance up to 3) My current use case is that I have e.g. a FieldTransform (let's call it "Target"), I want a function that is in another one component (let's nam...
over 1 year ago in Jedox Platform / Integrator 0 Future consideration

Multiselecting rows in ETL transforms to delete or sort up/down (no XML)

Sometimes when we work in the Field Transform or Table view, Target columns could have a large number of rows. IT would be useful if we could multi-select them (on shift perhaps) and then delete them or move them without the need to use XML view.
over 1 year ago in Jedox Platform / Integrator 0 Future consideration

Can we have both Job AND Load execution in a Switch job?

can we have both Job AND Load execution in a Switch job? Currently only Job is possible. This is a bit cumbersome because one has to create an extra Job on top of each Load.
over 1 year ago in Jedox Platform / Integrator 0 Future consideration

Make Jedox Monitor (Integrator) more resilient

As a Data Integrator, I want to see the previous runtime executions in the monitor after the job/load's name was modified and executed. Currently, if I run the job/load, change the name, run it and check the previous execution (with the initial n...
over 1 year ago in Jedox Platform / Integrator 0 Planned

Showing number of rows if selected extract from cube

This should show information on how many lines are maximally possible to extract. Let's say that cube has 20540 filled cells for dimension filters. This number could be shown next to loaded cells.
over 1 year ago in Jedox Platform / Integrator 0 Future consideration

Assign used variables from ETL execution as default variable values

The idea is that the user is able to copy execution variables from the "Used variables" in the executions list to the Variable in Integrator. That makes it easer to drill into data previews with the proper variable assignment (without manually typ...
over 1 year ago in Jedox Platform / Integrator 0 Future consideration

Extraction of ADSO for SAP BW

Currently it is just possible to extract DSOs. According to our BI-Team ADSOs are state-of-the-art and so it would be helpful to be able to extracte ADSOs in Jedox.
over 1 year ago in Jedox Platform / Integrator 0 Future consideration

Possibility to rename Global connection before saving it.

When creating a global conenction in integrator , user is unable to rename it from New Jedox OLAP Connection before saving it. Only after connection is made you can rename it. This is possible for any other type of connection. For instance, Jedox ...
over 1 year ago in Jedox Platform / Integrator 0 Future consideration

Support HTTP 2 calls

For a REST connection to Insomnia server HTTP 2 calls are required. For this connection type we need to have by default TLS 1.3.
over 1 year ago in Jedox Platform / Integrator 0 Future consideration

Flow Graph - change and save positions in flow graph

It would be helpful to be able to edit and save the positions of elements in the flow graph. So the user is able to get even more structure in the flow graph.
almost 2 years ago in Jedox Platform / Integrator 0 Future consideration