The user is confused, when adding a new report, or published an existing one, that the report does not show in the menu. When a user adds new reports or publishes existing ones, the user wants to get a pup-up message with a hint that the user must...
Enable users to see if a project or component is currently being edited by another user, reducing the risk of overwriting changes and improving team coordination.
Reduce minimal column width of Element column in dimension editor of the Modeler
Even if element names are all short it is not possible to reduce the column width of the column Element in the dimension editor of the Modeler according to the element names because there seems to be a minimal width for that column. This minimal c...
Install all possible licenses on POC cloud instance by default!
Let’s make it standard practice to put all the licenses in place for a POC setup. Skip confusing the sales team please! It will be turned off at some point, so no revenue issue, but we could need it for a demo, and it is a pain to go back and ask ...
Currently there are two options when you click on the "Export" button in the rules area of a cube: 1) Database Script / 2) Text File. It looks like these are two options for the same outcome. But actually it's not: 2) extracts the rules only / 1) ...
The idea is to maximize content visibility, make clean design and enhance user productivity. When user opens Reports environment. It has 5 lanes that take space: ribbon that says "REPORTS", opened tabs, Home, Layout, Help content of selection abov...
Basic reporting functionalities like scaling factors, number format should be available at report level as a standard like zero suppression Users should be able to decide scaling factors on the fly if they wish to see numbers in absolute value or ...
In many reports I need to consider date intervals. for example beginning is
2012-11 and end is 2015-03
Calendar is
- All Years
- Year
- Quar.
- Month
So a macro calculates all needed Elements:
- 2011-11, 2011-12, 2012, 2013, 2014, 2015-Q1
This is...
Navigating from a scheduled task in task scheduler to the actual ETL component (groovy/ standard job, etc) would be handy. Right clicking and selecting an option to navigate to the respective ETL component would save a lot of time in implementatio...