Skip to Main Content
Jedox Ideas

Let us know how we can make Jedox even better!

ADD A NEW IDEA

All ideas

Showing 1208

drill-down level of dynarange with variable

Enable drill-down begin of a dynarange not only by "hardcoded" number, but with a variable. So you could easily set up the expansion levels.
about 5 years ago in Jedox Platform / Jedox Web Navigation / Other 9 Future consideration

Dynamic label for buttons

Today, button's label is a static value. Could be very useful in Reports and Canvas to have dynamic sources like variables or named ranges
over 2 years ago in Jedox Platform / Jedox Web Navigation 1 Planned

System to remember users option of "Hide Empty elements" in Element Selector

When a view is zero suppressed on a large cube, the element Selectors in the Title (POV) dimensions automatically select "Hide Empty Elements" . There is no way to uncheck this without triggering a view refresh in the pasted view. The dialog shoul...
5 months ago in Jedox Platform / Views 3 Future consideration

Enable Trace Cell Value in Excel 365 Add-in

In the classic Add-in, it's possible to use right-click to access the "Trace Value" option which allows you to have overall information on the value calculation, path, etc. This is a needed feature in the new Excel Add-in

Merged Cell re-implementation

There are several known issues/limitations with the current implementation of merged cells: - Thick border problem on merged cells - If formatted gets white border. - Problem with merged cell when scrolling - Merged cells and freeze pane - Merged ...
about 5 years ago in Jedox Platform / Jedox Web Navigation 1 Future consideration

Editing Named Ranges and Variables in reports

When handling Named Ranges and Variables in reports it would be helpful to be able to export/import all Named Ranges and Variables. (And be able to edit them in excel for example.) Plus it would be good to have the possibility to edit the name dir...
4 months ago in Jedox Platform / Web Spreadsheet 0 Future consideration

Roll-back of write actions when execution of Integrator job fails

When executing an Integrator job that writes data to a database with limited user permissions in that database, it could happen that the job does not complete successfully because some write actions fail (due to missing permissions of the user). I...
about 1 year ago in Jedox Platform / Integrator 0 Future consideration

In a cube with persisted relational ETL drillthrough data, allow cube-drilldown in areas where no relational data is available.

As of version 2023.4, the Jedox drillthrough capabilities have become a native functionality outside of the SVS scripts. In the KB it says for the mode automatic: drills through if ETL is available, or else drills down. This suggest that right-cli...
about 1 month ago in Jedox Platform / In-Memory DB 0 Future consideration

Drill-by feature rights flexibility

Our users cannot use the drill-by feature (or the new dynatable feature) because they have some restrictions on their rights within a cube - even though the rights don't affect what they would see. For example, if they can't access a legal entity,...
about 1 month ago in Jedox Platform / Planning & Analytics 1 Future consideration

Add Cost center dimension to PnL/BS/CF cubes

Model: Add Cost Center/Departments to PnL/BS/CF cubes.This is a very common use case in USA. We have to adjust it in every project or start with an own solution instead of the Accelerators.
about 1 year ago in Jedox Best Practice Accelerator (BPA) / Integrated Financial Planning 0 Future consideration