Integrator

Showing 181

Tomcat multicore support

As I have been informed by Jedox Dev team, the ETL-Server (Tomcat Service) is running one job per CPU core. This behaviour is mainly slowing down our ETL projects since a huge amount of data has to be proceeded. The number of cores that should be ...
almost 6 years ago in Jedox Platform / Integrator 2 Not Planned

Tags for ETL-components

Choose several ETL components of one project which belong somehow logically together and group them under a given name. Should be displayed in ETL Manager under a new item -Tags --- SalesRelated ------Extract --------- E_XY_1 --------- E_XY_2 ----...
almost 6 years ago in Jedox Platform / Integrator 2 Planned

XBRL certification

Idea: To communicate with financial institutes companies use the XBRL standard. It would be great to be XBRL certificated. Background: XBRL is a freely available and global framework for exchanging business information. XBRL allows the expression ...
6 months ago in Jedox Platform / Integrator 0 Future Consideration

Add dropdown selection for Jedox databases in connections

Please add the possibility in the Jedox connection (global connection + "normal" connection - see screenshots) to select the database from a dropdown selection, after the connection (e.g. localhost) was selected. Thank you! :)
3 months ago in Jedox Platform / Integrator 0 Planned

Request to change behaviour of LoopParallel Job

From LoopParallel Job (jedox.com) and Parallel Job (jedox.com) , "Suppose at the beginning of a parallel execution there is already another running parallel execution. In that case, the new one will only have one parallel sub-execution, i.e., no e...
7 months ago in Jedox Platform / Integrator 0 Future Consideration

Undo in Integrator

There is no way of undoing a change in Integrator rather than reloading the whole ETL Project. Once a change has been made one is forced to save! Would be helpful if you can leave a changed integrator component without saving it.
almost 6 years ago in Jedox Platform / Integrator 1 Planned

The Project box is not wide enough to show the full project names

The dropdown list in the 'Project' box is not wide enough to display the full project names. This limitation can pose challenges for users in identifying the correct project to choose, especially for a long project name; for example, a project...
over 1 year ago in Jedox Platform / Integrator 0 Planned

Start Scheduled Tasks from Integrator (Batch PDF, etc)

I want to start PDF Batches or Excel Batches after a successfull Integrator job (conditional job). Only if the necessary data was created during an ETL it would be quite convenient to start this PDF Batches from the integrator job as a last step –...
almost 3 years ago in Jedox Platform / Integrator 0 Future Consideration

Import Integrator Projects from SFTP (with ELT Project)

As a consultant, I would like to upload Integrator Projects from an SFTP Server. Basically, we would like to have the basic functionality of the "Import" option within the Integrator as a function that we can use within an ETL Job. This way we cou...
about 1 year ago in Jedox Platform / Integrator 2 Future Consideration

Improve Excel load mode for JedoxFiles

Currently, you cannot use add or update load mode for an excel file that resides in JedoxFiles. This means adding additional worksheets in an existing workbook is not possible. This should be enabled.
over 1 year ago in Jedox Platform / Integrator 0 Planned