Skip to Main Content
Jedox Ideas

Let us know how we can make Jedox even better!

ADD A NEW IDEA

Clear

Ideas

Showing 277 of 1403

Account for Different Fiscal years e.g. 1st of July to 30th of June

Account for Different Fiscal years e.g. 1st of July to 30th of June 
over 1 year ago in Jedox Solutions / Integrated Financial Planning 0 Future Consideration

REST Connector from an external Server to Jedox

The current REST Connector only supports one connection setup from JEDOX -> Server. This means that each accessing server must first open an incoming port. When an incoming port is opened, further steps must be initiated to secure the server. T...
over 1 year ago in Jedox Platform / Integrator 0 Planned

Integrator: Enable writeback via load for JDBC connections.

Integrator: Enable writeback via load for JDBC connections Users expect that writeback is also supported by JDBC connections.
over 4 years ago in Jedox Platform / Integrator 1 Future Consideration

IFP - Upload data for Accounts: PnL, BS, CC

Please adjust the dimension structure upload for the dimensions: PnL, BS, CC and all other dimensions which have the same case: Currently I download an empty excel file and upload it. If I click on download again the excel file is again empty. I c...
over 1 year ago in Jedox Solutions / Integrated Financial Planning 0 Future Consideration

Add a typical "Lagebericht" (Management report)

Based on the existing, broken demo example, it would be great to have such an output, customers are asking for. It shows, how we can structure the content overview in a quantitative and qualitative way, basically iterating through the whole conten...
about 1 year ago in Jedox Solutions / ESG 0 Planned

Create a connector for the DuckDB database

Offering a native DuckDB connector first would give Jedox a commercial advantage with data-driven teams and pave the way for scalability via MotherDuck without changing the API.
5 months ago in Jedox Platform / Integrator 0 Future Consideration

Enable SSO usage in JedoxOLAP connections (Integrator) across different OLAP instances

Currently the option SAML / SSO authentication and session handling are not designed or implemented to be shared across different OLAP instances. It would be great the be able to trigger a user authentication across different OLAP instances via Je...
5 months ago in Jedox Platform / Integrator 0 Future Consideration

ESG - Material Data Points Report

Add a new report that lists all material data points in a structured format, showing whether each has been provided (input) or is still missing. The report would include the following columns: Previous Year Current Year Delta (Change) Input Status...
5 months ago in Jedox Solutions / ESG 0 Planned

Start Scheduled Tasks from Integrator (Batch PDF, etc)

I want to start PDF Batches or Excel Batches after a successfull Integrator job (conditional job). Only if the necessary data was created during an ETL it would be quite convenient to start this PDF Batches from the integrator job as a last step –...
over 3 years ago in Jedox Platform / Integrator 0 Future Consideration

The Project box is not wide enough to show the full project names

The dropdown list in the 'Project' box is not wide enough to display the full project names. This limitation can pose challenges for users in identifying the correct project to choose, especially for a long project name; for example, a project...
almost 2 years ago in Jedox Platform / Integrator 0 Planned