Skip to Main Content
Jedox Ideas

Let us know how we can make Jedox even better!

ADD A NEW IDEA

Clear

Ideas

Showing 311 of 1403

ESG - flexible data Input with multi-unit Support for GHG emisssions.

Background: To calculate CO₂ emissions accurately, organizations collect activity data from various sources—often provided in different units depending on the supplier, region, or system (e.g., electricity in kWh, fuel in liters, travel in km, was...
6 months ago in Jedox Solutions / ESG 0 Future Consideration

ESG - Assign responsibilities per ESG data point

Background: In ESG reporting, ensuring data ownership and accountability is critical for transparency, audit readiness, and ongoing data quality. Currently, responsibilities for specific ESG data points are not clearly assigned within the system, ...
6 months ago in Jedox Solutions / ESG 1 Future Consideration

ESG - copy double materiality assessment to new year

Purpose: Allow users to duplicate the double materiality assessment data from one year to another (e.g., 2025 to 2026) to save time and maintain consistency, while allowing adjustments for the new year. Feature: Copy the double materiality assesss...
6 months ago in Jedox Solutions / ESG 0 Future Consideration

ESG - Flexible CO₂ Factor Mapping for Building Energy Consumption

Background: A customer requires the conversion of building energy consumption into CO₂ equivalents as a critical part of their emissions reporting. Proposed Idea: Introduce an additional features within the ESG solution to calculate not only for t...
6 months ago in Jedox Solutions / ESG 0 Future Consideration

Find and Replace - XML editor

It would be very useful to have the possibility to instead of only find, to have a find and replace option. Then users could edit things faster and help them spend less time in the editor. The alternative is to copy the text in some other editor. ...
about 2 years ago in Jedox Platform / Integrator 2 Planned

Import Integrator Projects from SFTP (with ELT Project)

As a consultant, I would like to upload Integrator Projects from an SFTP Server. Basically, we would like to have the basic functionality of the "Import" option within the Integrator as a function that we can use within an ETL Job. This way we cou...
over 1 year ago in Jedox Platform / Integrator 2 Future Consideration

Jump from Monitor Warning to the failed component

It would be much easier to work with the monitor if its possible to right click on a warning message and have the option to jump directly into the function (fieldtransform, extract or whatever) where the warning message comes from.
over 5 years ago in Jedox Platform / Integrator 0 Future Consideration

HR - copy Personnel Planning from one month across future periods

Enable planners to select a specific month (e.g., 2025-03) and automatically copy the personnel costs, FTE, and headcount values from that month to a defined range of future months (e.g., 2026-01 to 2026-12) for a selected version (e.g., Budget 20...
6 months ago in Jedox Solutions / Human Resources 0 Future Consideration

Connection to Microsoft Analysis Server

Hello, we have client which data is stored in SQL Databases. But some logic which is hardcoded done with Microsoft Analysis Server and data for EPM tool is prepared in Microsoft Analysis Server in Database which have Dimensions and Cubes. But, Jed...
6 months ago in Jedox Platform / Integrator 1 Future Consideration

Check user permissions before execution of Integrator job

When executing an Integrator job with limited user permissions in a database, it could happen that the job does not complete successfully due to missing permissions of the user. If in that case some write actions were already executed and others a...
about 2 years ago in Jedox Platform / Integrator 1 Future Consideration