Start Scheduled Tasks from Integrator (Batch PDF, etc)
I want to start PDF Batches or Excel Batches after a successfull Integrator job (conditional job). Only if the necessary data was created during an ETL it would be quite convenient to start this PDF Batches from the integrator job as a last step –...
Allowing Actions on Labels were initially disallowed because strictly speaking Labels should just be a visual object. However, labels have a lot more formatting capabilities than buttons, combo boxes or lists. For example, vertical centering, word...
The Project box is not wide enough to show the full project names
The dropdown list in the 'Project' box is not wide enough to display the full project names.
This limitation can pose challenges for users in identifying the correct project to choose, especially for a long project name; for example, a project...
Wenn performing a load of a cube with drillthrough parallel load a log line states : Number of rows in table "<schema>"."table" changed from xxx to yyy the query performed to do that is select count(*) from <schema>.<table> thus ...
Add the option "Wait for job to be done" to the scheduler action
For the moment, we can't have a scheduler action and then a download file action. (The download action is lauched before the end of the scheduler). It will be interresting to have the option "Wait for job to be done" (like with integrator action) ...
Remove "Session Data Missing" Warning during Login
The "Session Data Missing" warning indicates that the session cookie was not found. I don't think that it still serves a purpose and it is shown for almost every user.
Offering a native DuckDB connector first would give Jedox a commercial advantage with data-driven teams and pave the way for scalability via MotherDuck without changing the API.
Beside selecting a date from the datepicker, the input field should also be filled manually without selecting from the datepicker. So the user can choose if he wants to select the date from the datepicker or if he wants to enter the date manually....
In many reports I need to consider date intervals. for example beginning is
2012-11 and end is 2015-03
Calendar is
- All Years
- Year
- Quar.
- Month
So a macro calculates all needed Elements:
- 2011-11, 2011-12, 2012, 2013, 2014, 2015-Q1
This is...