Skip to Main Content
Jedox Ideas

Let us know how we can make Jedox even better!

ADD A NEW IDEA

Clear

Ideas

Showing 272 of 1403

Import Integrator Projects from SFTP (with ELT Project)

As a consultant, I would like to upload Integrator Projects from an SFTP Server. Basically, we would like to have the basic functionality of the "Import" option within the Integrator as a function that we can use within an ETL Job. This way we cou...
over 1 year ago in Jedox Platform / Integrator 2 Future Consideration

Jump from Monitor Warning to the failed component

It would be much easier to work with the monitor if its possible to right click on a warning message and have the option to jump directly into the function (fieldtransform, extract or whatever) where the warning message comes from.
over 5 years ago in Jedox Platform / Integrator 0 Future Consideration

Option to Deactivate to Automatic Update of Palo Formulas in Excel after Opening an Excel File

With the Excel add-in we have the issue that if somebody without Jedox access opens the file he gets value errors as Jedox automatically connects as soon as the file is opened. We have other tools for which we can deactivate the update functionali...

Excel 365 Add-in: Change multiple Dimensions at once before applying to view

In the COM Add-in, we can change the setting for a view on several dimensions at once (in the Edit View Dialog) before applying these settings to the report and trigger a new calculation of the figures. This should be possible in the 365 Add-in as...
about 1 year ago in Jedox Platform / Microsoft Office integrations (Excel, PowerPoint, & Word) 0 Future Consideration

Rollback functionality for Jedox ETL

When loading data into relational database, the Jedox ETL commit the data every 1000 records by default, and it's not possible to change the commit size to "unlimited". Therefore, if the data loading was failed at the middle of the execution, the ...
over 6 years ago in Jedox Platform / Integrator 0 Not Planned

Check user permissions before execution of Integrator job

When executing an Integrator job with limited user permissions in a database, it could happen that the job does not complete successfully due to missing permissions of the user. If in that case some write actions were already executed and others a...
about 2 years ago in Jedox Platform / Integrator 1 Future Consideration

Connection to Microsoft Analysis Server

Hello, we have client which data is stored in SQL Databases. But some logic which is hardcoded done with Microsoft Analysis Server and data for EPM tool is prepared in Microsoft Analysis Server in Database which have Dimensions and Cubes. But, Jed...
7 months ago in Jedox Platform / Integrator 1 Future Consideration

Allow the Guess Argument to reference parameters from another sheet

An improvement area of the guess argument feature (very useful by the way) would be to facilitate links with parameters / named cells in other sheets. In our Excel spreadsheets, we usually define parameters in a specific worksheet. As of today, t...

Request to change behaviour of LoopParallel Job

From LoopParallel Job (jedox.com) and Parallel Job (jedox.com) , "Suppose at the beginning of a parallel execution there is already another running parallel execution. In that case, the new one will only have one parallel sub-execution, i.e., no e...
about 1 year ago in Jedox Platform / Integrator 0 Future Consideration

Protect cube cells in the Financial Consolidation model on database level for completed workflow activities

In the current implementation workflow (including the protection of changing cell values and executing procedures) is implemented in designed web reports. Users using views, the Excel add-in or other methods to access database cells can bypass the...
over 4 years ago in Jedox Core Models / Financial Consolidation Model 1 Future consideration