Start Scheduled Tasks from Integrator (Batch PDF, etc)
I want to start PDF Batches or Excel Batches after a successfull Integrator job (conditional job). Only if the necessary data was created during an ETL it would be quite convenient to start this PDF Batches from the integrator job as a last step –...
Enable SSO usage in JedoxOLAP connections (Integrator) across different OLAP instances
Currently the option SAML / SSO authentication and session handling are not designed or implemented to be shared across different OLAP instances. It would be great the be able to trigger a user authentication across different OLAP instances via Je...
Add a new report that lists all material data points in a structured format, showing whether each has been provided (input) or is still missing. The report would include the following columns: Previous Year Current Year Delta (Change) Input Status...
The Project box is not wide enough to show the full project names
The dropdown list in the 'Project' box is not wide enough to display the full project names.
This limitation can pose challenges for users in identifying the correct project to choose, especially for a long project name; for example, a project...
Wenn performing a load of a cube with drillthrough parallel load a log line states : Number of rows in table "<schema>"."table" changed from xxx to yyy the query performed to do that is select count(*) from <schema>.<table> thus ...
it could be usefull to have a new log level "Info+" : sometimes it is useful to log informations that are relevant and that you want to catch attention to, but you do not want to cause a warning. A new method "LOG.infoPlus()" or something would be...
Add a new column with the thresholds next to the scores for better explanation of the calculation way for the Auditor / Wirtschaftsprüfer. And add an explanation of the calculation way.