When executing an Integrator execution this would be helpful to be able to get the information whether it has been triggered using a macro, a scheduled task, and so on...
Integrator function to import/export a file into Designer
Jedox Integrator needs a function/load to take a file from another datasource (local neetwork drive, FTP, OneDrive, Sharepoint, etc) and load to Filemanager (Designer). Ot should be able to do the reverse as well (ie export).
Currently, you cannot use add or update load mode for an excel file that resides in JedoxFiles. This means adding additional worksheets in an existing workbook is not possible. This should be enabled.
Ability to edit a report in designer (back-end) from the reporting view (front-end)
It will help a consultant to edit the report in designer from the font-end view. This can save time to search the reports from the designer folders. We can have a edit report link in the toolbar for this.
Dynamic data format (linked to variables) on dynamic charts would be highly valuable and would allow to switch from KPis in M€, %, units…and adapt charts accordingly. Today, we have to develop severals reports / charts specific to one kind of form...
Possibility to restore old versions in the designer / integrator
If you work on a report or an integrator project and save it, you realize that you would like to restore your version from 1 day / 1 hour ago. An automated possibility for that would be great. Otherwise we always need to store our projects / desig...
Centre cells vertically Possibility to select multiple cells at once with the "Control" key Possibility to extend values or formulas from one cell to another
In Edit Filter dialog, there should be a checkbox labeled "Subtotal" . If checked, underneath the selected elements the column values are subtotaled. The subtotal persists with the filter - but only if the rows remain unchanged. expanding/contract...
integrator_start_job: optional parameter allowing similar executions
in the function integrator_start_job there is a condition checking whether the very same job (check is done over the locator) is currently running: if(intval($count) > 0){ // if so print status and exit integrator_set_job_status(null,$statu...
As a power user of the Financial Consolidation model I want to proceed (or restart, see related idea)) multiple workflow steps at once so that I don't have to repeat this multiple times. This should be possible on any aggregated element above the ...