Skip to Main Content
Jedox Ideas

Let us know how we can make Jedox even better!

ADD A NEW IDEA

Integrator

Showing 164

Move options Run and Data preview to the very left of the transform/load options bar

Move options Run and Data preview to the very left of the transform/load options bar. I spend half of my life as a Jedox consultant with scrolling to the right ;)
3 months ago in Jedox Platform / Integrator 2 Planned

Add Python Code Module to Integrator similar to R-Code Module

Python is our typical scripting language. It would be beneficial if we could use our skills also in Jedox or if we could copy code from other systems to Jedox.
about 1 year ago in Jedox Platform / Integrator 1 Planned

Option for automatical restart of ETL jobs after the server went down or restarts

Scenario:There is a long running ETL job and the Jedox server or part of services went down or "crashes". After the (re-)start of the components/services the ETL jobs are marked as failed or aborted. Here there is need for a feature or a new optio...
2 months ago in Jedox Platform / Integrator 0 Future Consideration

debug mode for macros and script code in ETL

when writing macros or script code in ETL it is often difficult to find out what went wrong and when it went wrong. The only way at the moment is to scan the log files for error messages. For development it would be helpfull to have a debug mode ...
over 5 years ago in Jedox Platform / Integrator 0 Not Planned

Additional column for drillthorugh

It would be very helpful to be able to add columns to an existing drillthrough database. Currently this is not possible. There is no control over the drillthrough database at all (only via ETL Load process). This is a pain once there are more colu...
28 days ago in Jedox Platform / Integrator 2 Internal Review

Request to change behaviour of LoopParallel Job

From LoopParallel Job (jedox.com) and Parallel Job (jedox.com) , "Suppose at the beginning of a parallel execution there is already another running parallel execution. In that case, the new one will only have one parallel sub-execution, i.e., no e...
28 days ago in Jedox Platform / Integrator 0 Future Consideration

New connection type to DATEV in the Integrator

Similar to SAP, a new connection type to DATEV should be offered, ideally with pre-built extract types, to be able to quickly generate master and transactional data in Jedox.
over 2 years ago in Jedox Platform / Integrator 7 Future Consideration

Change of "File based" Global Connections similar to SAP/SQL

Currently Global Connections such as Azure Blob, OneDrive, SharePoint are not usable, because they always point to a specific file. In contrast, Global Connections of SAP or SQL only store user and system credentials. This needs to be the same for...
about 1 month ago in Jedox Platform / Integrator 0 Future Consideration

REST Connector from an external Server to Jedox

The current REST Connector only supports one connection setup from JEDOX -> Server. This means that each accessing server must first open an incoming port. When an incoming port is opened, further steps must be initiated to secure the server. T...
4 months ago in Jedox Platform / Integrator 0 Planned

create folders in ETL integration manager (by user)

instead of forcing the creation of folders by component type (e.g. "Cube", "Dimension", .. for extracts), it would be very much appreciated, if it was possible to create a folder-structure by user. Potentially, these folders could also span across...
over 5 years ago in Jedox Platform / Integrator 2 Future Consideration