Only stop the services when no Integrator job is running
We have implemented on our own systems that the restart of the services, which is carried out during the backup, only takes place when an ETL job is no longer running. This is also necessary for the cloud.
when a component refers to several sources (e.g. FieldTransform with n lookups) it would be nice to highlight the "main" source in the flowchart (for instance a bold line)
It's necessary to have an option of Partial Reload in the Integrator Qlik Load. Qlik Sense supports it. And it saves a lot of time during data sinchronization between Jedox and Qlik.
Sometimes this could be useful to be able to pin more than 1 view in Integrator (for instance up to 3) My current use case is that I have e.g. a FieldTransform (let's call it "Target"), I want a function that is in another one component (let's nam...
Sometimes (while in development or production) an ETL job fails at a certain point. Then often all steps before were successful and after solving the problem I would like to continue the ETL from the failed element onwards. Instead I have to resta...
Add navigation capabilities (previous/next/first/last) in the FieldTransform functions
if you want to edit the next or the previous function in ETL client, you have to close the current one, and click on edit for the following. This would be helpful to jump to the next or previous one without closing the window
Can we have both Job AND Load execution in a Switch job?
can we have both Job AND Load execution in a Switch job? Currently only Job is possible. This is a bit cumbersome because one has to create an extra Job on top of each Load.
Showing number of rows if selected extract from cube
This should show information on how many lines are maximally possible to extract. Let's say that cube has 20540 filled cells for dimension filters. This number could be shown next to loaded cells.