Skip to Main Content
Jedox Ideas

Let us know how we can make Jedox even better!

ADD A NEW IDEA

Integrator

Showing 90

GraphQL/Connector (API support)

This is a partner request(Alvarezan): We request that Jedox highly consider a dedicated GraphQL connector to the Jedox platform. As discussed on the call, GraphQL is being used by the clients with whom we work, and we would like to use a direct co...
3 months ago in Jedox Platform / Integrator 0 Future consideration

Continue on Error in CubeSliceCopy

In the CubeSliceCopy load, if a single record fails, the whole process fails. There should be an additional option "Continue on error". This would still log an error in the log for that specific record, but it would allow the rest of the load to c...
about 2 months ago in Jedox Platform / Integrator 0 Future consideration

Customizable Naming Conventions for Integrator Projects

Currently, when creating a new Extract within the Integrator, the system automatically generates a default name, such as "New Excel Extract." However, given the varying preferences of consultants, it would be beneficial to offer users the option t...
6 months ago in Jedox Platform / Integrator 0 Future consideration

Acces Cloud storage services - Google Drive

At one of our prospects, we ran into a requirement, where prospect files are located in Google Drive. Since cloud solutions are spreading, it will be a more and more frequent required functionality to access these cloud-based file servers. If it i...
7 months ago in Jedox Platform / Integrator 0 Future consideration

Check user permissions before execution of Integrator job

When executing an Integrator job with limited user permissions in a database, it could happen that the job does not complete successfully due to missing permissions of the user. If in that case some write actions were already executed and others a...
8 months ago in Jedox Platform / Integrator 1 Future consideration

Undo in Integrator

There is no way of undoing a change in Integrator rather than reloading the whole ETL Project. Once a change has been made one is forced to save! Would be helpful if you can leave a changed integrator component without saving it.
almost 5 years ago in Jedox Platform / Integrator 1 Future consideration

Start Scheduled Tasks from Integrator (Batch PDF, etc)

I want to start PDF Batches or Excel Batches after a successfull Integrator job (conditional job). Only if the necessary data was created during an ETL it would be quite convenient to start this PDF Batches from the integrator job as a last step –...
almost 2 years ago in Jedox Platform / Integrator 0 Future consideration

folder creation after ETL excel load

What exists today and what is great : When using the upload action, it is possible to save a file in a folder that doesn't exist yet. Indeed, when we will configure the action, we will specify the path (including the name of a folder that doesn't ...
7 months ago in Jedox Platform / Integrator 0 Future consideration

Snowflake connector Improvement

In the new version 2023.3, we started to use the new Snowflake connector. When the current snowflake connector queries all meta data (e.g. table names, column names), the query is over ALL tables and columns in the Siemens Snowflake Account. This ...
7 months ago in Jedox Platform / Integrator 0 Future consideration

REST Connection Output Formatting for Improved Testing

As a user, I would like to be able to see json testing format in a prettier manner. Currently, we need to scroll to the right in order to see what is there or to select all and copy to some notebook. Even when we copy it to Notepad we need to save...
7 months ago in Jedox Platform / Integrator 0 Future consideration