Skip to Main Content
Jedox Ideas

Let us know how we can make Jedox even better!

ADD A NEW IDEA

Clear

Ideas

Showing 286 of 1403

ESG - Flexible CO₂ Factor Mapping for Building Energy Consumption

Background: A customer requires the conversion of building energy consumption into CO₂ equivalents as a critical part of their emissions reporting. Proposed Idea: Introduce an additional features within the ESG solution to calculate not only for t...
6 months ago in Jedox Solutions / ESG 0 Future Consideration

Jump from Monitor Warning to the failed component

It would be much easier to work with the monitor if its possible to right click on a warning message and have the option to jump directly into the function (fieldtransform, extract or whatever) where the warning message comes from.
over 5 years ago in Jedox Platform / Integrator 0 Future Consideration

HR - copy Personnel Planning from one month across future periods

Enable planners to select a specific month (e.g., 2025-03) and automatically copy the personnel costs, FTE, and headcount values from that month to a defined range of future months (e.g., 2026-01 to 2026-12) for a selected version (e.g., Budget 20...
6 months ago in Jedox Solutions / Human Resources 0 Future Consideration

Connection to Microsoft Analysis Server

Hello, we have client which data is stored in SQL Databases. But some logic which is hardcoded done with Microsoft Analysis Server and data for EPM tool is prepared in Microsoft Analysis Server in Database which have Dimensions and Cubes. But, Jed...
6 months ago in Jedox Platform / Integrator 1 Future Consideration

Check user permissions before execution of Integrator job

When executing an Integrator job with limited user permissions in a database, it could happen that the job does not complete successfully due to missing permissions of the user. If in that case some write actions were already executed and others a...
about 2 years ago in Jedox Platform / Integrator 1 Future Consideration

Rollback functionality for Jedox ETL

When loading data into relational database, the Jedox ETL commit the data every 1000 records by default, and it's not possible to change the commit size to "unlimited". Therefore, if the data loading was failed at the middle of the execution, the ...
over 6 years ago in Jedox Platform / Integrator 0 Not Planned

Request to change behaviour of LoopParallel Job

From LoopParallel Job (jedox.com) and Parallel Job (jedox.com) , "Suppose at the beginning of a parallel execution there is already another running parallel execution. In that case, the new one will only have one parallel sub-execution, i.e., no e...
about 1 year ago in Jedox Platform / Integrator 0 Future Consideration

Best Practice Accelerator for S&OP

Create a new BPA for S&OP. Idea was mentioned during Weekly Demo Use Case Call on August 15th by Julian, Tim and Jack. Also, Florian mentioned the importance of a S&OP solution during QBR in Jan 2023
about 2 years ago in Jedox Solutions / Sales 0 Planned

MS Connectivity: Ensure Azure Blob Storage/Data Lake v2 Connection also works with MS Fabric/OneLake

Microsoft are heavily pushing MS Fabric and thereby their "OneLake" concept. "OneLake" can be adressed similarly to DataLake v2 and thereby probably as Blob Storage, but I think none of us have tested that. Furthermore, we don't show the wording "...
over 1 year ago in Jedox Platform / Integrator 0 Future Consideration

Increase the size of some ETL- input fields for better handling and input

Please increase the size of some ETL- input fields, where many characters can be entered.For instance: logical expression fields; json template in JSON connections, etc.The current size is error-prone and inconvenient.
almost 4 years ago in Jedox Platform / Integrator 0 Future Consideration