Skip to Main Content
Jedox Ideas

Let us know how we can make Jedox even better!

ADD A NEW IDEA

Clear

Ideas

Showing 528 of 1403

Jump from Monitor Warning to the failed component

It would be much easier to work with the monitor if its possible to right click on a warning message and have the option to jump directly into the function (fieldtransform, extract or whatever) where the warning message comes from.
over 5 years ago in Jedox Platform / Integrator 0 Future Consideration

ESG - preloaded library of common CO₂ Emission factors

Background: Users often struggle to find and maintain accurate emission factors for different activity types (electricity, fuel, travel, waste, etc.). Manually sourcing factors from various databases leads to inconsistencies, version drift, and ex...
6 months ago in Jedox Solutions / ESG 0 Future Consideration

ESG - flexible data Input with multi-unit Support for GHG emisssions.

Background: To calculate CO₂ emissions accurately, organizations collect activity data from various sources—often provided in different units depending on the supplier, region, or system (e.g., electricity in kWh, fuel in liters, travel in km, was...
6 months ago in Jedox Solutions / ESG 0 Future Consideration

ESG - Assign responsibilities per ESG data point

Background: In ESG reporting, ensuring data ownership and accountability is critical for transparency, audit readiness, and ongoing data quality. Currently, responsibilities for specific ESG data points are not clearly assigned within the system, ...
6 months ago in Jedox Solutions / ESG 1 Future Consideration

ESG - copy double materiality assessment to new year

Purpose: Allow users to duplicate the double materiality assessment data from one year to another (e.g., 2025 to 2026) to save time and maintain consistency, while allowing adjustments for the new year. Feature: Copy the double materiality assesss...
6 months ago in Jedox Solutions / ESG 0 Future Consideration

ESG - Flexible CO₂ Factor Mapping for Building Energy Consumption

Background: A customer requires the conversion of building energy consumption into CO₂ equivalents as a critical part of their emissions reporting. Proposed Idea: Introduce an additional features within the ESG solution to calculate not only for t...
6 months ago in Jedox Solutions / ESG 0 Future Consideration

Distributing Jedox Suite Components on Multiple Servers

The possibility to distribute every component on multiple servers will ensure scalability for very large models. One Master could distribute read requests to multiple workers and aggregate the results from all workers before sending the result to ...
over 6 years ago in Jedox Platform / Other 1 Future Consideration

Rollback functionality for Jedox ETL

When loading data into relational database, the Jedox ETL commit the data every 1000 records by default, and it's not possible to change the commit size to "unlimited". Therefore, if the data loading was failed at the middle of the execution, the ...
over 6 years ago in Jedox Platform / Integrator 0 Not Planned

Make answers from tickets public

When posting a ticket I often have the feeling that a lot of people must have dealt with the same problem already. It would be good to be able to search the tickets of other customers and the Jedox-Support's reply. That way it would be a lot easi...
over 6 years ago in Jedox Platform / Other 4 Not Planned

Automate environment migration (Web reports, database, security ...)

Automate by scripts or the web console, imports and exports from one environment to another (Web reports, database, security ...) without performing a restart of Jedox Setup (“Repair”)
over 6 years ago in Jedox Platform / Other 3 Future Consideration