When you have created an input template, you cannot use trace cell on non input cells. It works find on input ready cells. I do however often find it more relevant to trace the calculated cells, which is typically not input relevant.
Add tooltip and/or other visualization for long component names in Integrator
When building complex Integration projects, if you have long component names , it is sometimes impossible to differentiate between similarly named long source components. The following features would help: Tooltip. There should be a tooltip on the...
Create a standard backup that has the latest licenses and models to lay on new POC Server
Let consider having a Standard Instance backup prepared A standard instance backup can be prepared that has all the licenses and models needed for partners and presales. This backup can be updated from time to time with the latest models and used ...
Current POC default Databases are over 5 years old (too old)
Our current POC databases and reports that come in our instances are over 5 years old. They do not demonstrate any of the newer capabilities such as Canvas Dashboards. Optimally for partners and presales we would have the latest OnePlatform, AIssi...
The Drill By feature is very useful, but it only reports accurately on filtered Dimensions. If you have filtered on a Virtual Dimension, it is ignored, hence Drill By does not report the correct filtered value.
A ‘!! Like’ command exists, but not a ‘## Like’ command.‘## Like' command is executed, but it implements a simple 'Like' command (overwrites existing values with a new distribution). I would like to implement the following command:##-5 like BM_o...
Currently, jedox only offers classic user and password authentication. Since it's standard now to use Tokens, it is mandatory to give this option as well for MS SQL DB. The Microsoft Fabric Warehouse for example works this way and currently there ...
In Modeller group databases by model to which they belong.
In Modeler we often have many databases with different names. In our situation, we have several teams working on separate projects.Most projects are grouped via Models functionality where the Model groups Reports, Integrator jobs, and Scheduler ta...
It should be possible to choose and smooth line chart or a spline chart. Especially when showing a trend, it is often more appealing to the eye, if the lines in a chart are more 'round' A spline-chart solves this issue. Currently it is only possib...