In order to be able to use projects as sub-structures for a complex project it would be necessary to use a "master-project" to run jobs in other projects. This is currently not possible.
Would be most helpful.
A request for copy and paste of buttons is already posted here, c&p for dyna ranges will come in Jedox 6, what about combo boxes? There should also be an easy way to copy and paste combo boxes (as in general for ALL objects and components in a...
When building a new view via "view" in Excel, the window showing the dimensions is to small; only the first 7 dimensions are shown.
To see more dimensions one has to scroll down.
This is sometimes very hard/painful.
Please enlarge/heighten ...
The Excel extract in the ETL ignores empty lines.
e.g.
If you specify "Sheet1!A3:C100" to the Excel Extract and there are two empty lines at the top of the Sheet1, the Excel Extract start to read the sheet from fifth line of the sheet.
The ...
In Denormalization table transform I have to configure each measure column one by one manually with aggregation, type etc.
But based on the given measure/normalization column the system could generate them automatically -> at least as an ini...
Would be cool if default values for comboboxes etc could be synced automatically with the Qlik selection state and vice versa.
See the Qlik selection state at the top of the attached screenshot, vs the comboboxes in the embedded Jedox report.
Add Normalize (by Dimension) to Cube Upload Wizard
Subject: Enhance Cube Upload Wizard to support Normalization by Dimension. This will be useful for handling more output/upload formats - for example, we often see data with dates or items on columns. In 7.0 you have to do this manually using Table...